Back to category
Kayaba

Coil Spring K-Flex RC5818 Kayaba

  • Coil Spring K-Flex RC5818 Kayaba
  • Coil Spring K-Flex RC5818 Kayaba, Thumbnail 2
  • Coil Spring K-Flex RC5818 Kayaba, Thumbnail 3

Product number: 0475969

Manufacturer number: RC5818

EAN: 4909500598504

£ 35.92

Incl. VAT
View product specifications

Free Shipping


  • Free 30 days exchanges
  • Any part, any car
  • Fast shipping: 2 days
  • Expert support

Ecommerce Europe Trustmark

Customer service: +31 85 070 52 25

Ask your question at our product specialists.

Questions and answers.

Fit guarantee, show parts suitable for your vehicle.

or .

  • Specifications

    Are you planning to replace your car's spring? Kayaba springs are always supplied individually. However, we recommend replacing both springs at the same time. This is due to the safety of the car. Kayaba is a major manufacturer based in Japan. Kayaba also has three large factories in Europe.


    Fitting PositionRear axle left (passenger side)
    SuspensionFor vehicles with standard chassis
    Spring DesignCoil Spring
    applicationCoil spring
    Number in packaging1
    Outer diameter [mm]152
    Paired article numbersRC5817
    TypeAC
    Warranty2 years
    Length [mm]321
    Pieces needed2
    Thickness 1 [mm]12,3
    Weight [kg]2,25
  • Applicability

    HONDA
    HR-V
    HR-V (GH_) | 03.1999-09.2005 1.6 16V 4WD (GH2, GH4) - 1590ccm, 105pk, 77kw - D16W1
    HR-V (GH_) | 03.1999-09.2005 1.6 16V 4WD (GH2, GH4) - 1590ccm, 124pk, 91kw - D16W5
  • Manufacturer

    Kayaba
    For nearly a century, KYB has specialized in hydraulics, with technology widely used in the automotive industry. KYB is the leading hydraulic company from Japan. The KYB group, which has 15,000 employees worldwide,
    has a turnover of more than 3.8 billion, of which 60% comes from the sale of shock absorbers for cars. From its 15 factories in Asia, Europe and the United States, KYB has an annual production capacity
    of more than 75 million shock absorbers. KYB also has the largest shock absorber factory in the world, with a capacity of more than 50 million units. It is highly automated and can change from one strut to another in 15 seconds from producing.
  • Delivery time

    Expected delivery date:

    27-12-2024

Secure payment